Bematix Logo

Building Engineering management & automation information

Engineering Deliverables

Real Projects.
Real Results.

Explore actual engineering templates and technical drawings produced by our design office, from network risers to detailed DDC panel layouts.

Commercial Tower Network Riser
Commercial Real Estate

Commercial Tower Network Riser

Engineering Challenge

Need for a robust, scalable BACnet IP backbone to integrate thousands of data points across a 40-story multi-tenant building.

Our Solution

Designed a comprehensive network topology utilizing redundant fiber rings, distributed DDC panels per floor, and seamless integration with 3rd-party systems.

Deliverable Type
Network Topology & Riser Diagrams
Guaranteed high availability, eliminated network bottlenecks, and provided clear installation roadmaps.
Chiller Plant DDC Control Panel
Infrastructure

Chiller Plant DDC Control Panel

Engineering Challenge

Complex chiller sequencing requiring a high-density I/O footprint within a severely limited physical panel space.

Our Solution

Engineered a highly optimized internal backplate layout, utilizing compact I/O modules, efficient DIN rail spacing, and segregated low/high voltage cable ducts.

Deliverable Type
Internal Panel Layouts
Reduced panel footprint by 20%, ensuring safe heat dissipation and easing future maintenance access.
Type-A1 MCC/DDC Hybrid Panel
Industrial / Manufacturing

Type-A1 MCC/DDC Hybrid Panel

Engineering Challenge

Strict requirement for local manual override, alarm annunciation, and system monitoring directly on the panel face for maintenance personnel.

Our Solution

Designed a clean, intuitive front-door layout incorporating a touch HMI screen, manual HOA switches, and clear fault indication lamps.

Deliverable Type
Panel Door Elevations
Compliant with strict industrial safety standards and dramatically improved local operator efficiency.
Healthcare Isolation AHU Control
Healthcare

Healthcare Isolation AHU Control

Engineering Challenge

Strict requirement for precise temperature, humidity, and positive pressure control in critical hospital isolation wards.

Our Solution

Developed detailed system schematics incorporating heat recovery wheels, electric heaters, VFD supply/exhaust fans, and dedicated fire alarm interlocks.

Deliverable Type
System Schematics
Achieved 100% compliance with healthcare HVAC standards, ensuring patient safety and precise environmental control.
Constant Airflow AHU with HRW
Hospitality

Constant Airflow AHU with HRW

Engineering Challenge

Excessive energy consumption due to 100% fresh air requirements in extreme Gulf summer conditions for an accommodation building.

Our Solution

Implemented a constant air volume schematic integrated with an Energy Recovery Wheel (HRW) and chilled water cooling coil to drastically reduce the cooling load.

Deliverable Type
Sequences & Schematics
Projected 35% reduction in annual cooling energy costs while maintaining perfect indoor air quality.
NeedSimilarEngineeringDeliverables?

Contact our design office to discuss your specific project requirements and see how we can act as your remote engineering team.

Request a Quote